Identity area
Reference code
MT NAM OPM-01-1968-0390/1968
Title
Request by Mr. Joseph Gatt for an extension of time licence up to 2a.m. At premises at Qui-Si-Sana, Sliema. -Piper Club-.
Date(s)
- 27/04/1968 (Creation)
Level of description
File
Extent and medium
1 paper file
Context area
Name of creator
Repository
Archival history
Immediate source of acquisition or transfer
Content and structure area
Scope and content
-
Appraisal, destruction and scheduling
Accruals
System of arrangement
Conditions of access and use area
Conditions governing access
Conditions governing reproduction
Language of material
Script of material
Language and script notes
Physical characteristics and technical requirements
Finding aids
Allied materials area
Existence and location of originals
Existence and location of copies
Related units of description
Notes area
Note
Condition- Good; Language- English