Identity area
Reference code
SEC-1962-1223/1962
Title
Extension of time limit to Mr Joseph Darmanin to build new body on chassis of Bus no. 2296.
Date(s)
- 07/09/1962 (Creation)
Level of description
File
Extent and medium
1 paper file
Context area
Archival history
Immediate source of acquisition or transfer
Content and structure area
Scope and content
Memorandum for the Cabinet by Hon Prime Minister, No 27, Application for the withdrawal of a bus from public service for a period exceeding the normal limit of six months.
Appraisal, destruction and scheduling
Accruals
System of arrangement
Conditions of access and use area
Conditions governing access
Conditions governing reproduction
Language of material
Script of material
Language and script notes
Physical characteristics and technical requirements
Finding aids
Allied materials area
Existence and location of originals
Existence and location of copies
Related units of description
Notes area
Note
Condition- Good; Language- English