- FondsPDM - Plans, Drawings and Maps
- Series09 - Railway, Tram and Motor Traffic
- 926 more...
- Item63553 - Plan showing in red the proposed new position of Fleur De Lis archway, new traffic island proposed and in blue the pipline to replace existing aqueduct.
- Item63554 - Plan showing in yellow the propoerty to be dismembered keeping the Fleur De Lis archway, with a new traffic roundabout proposed.
- Item63555 - Plan showing in red the approved alignments, new traffic roundabout and in green lattice the proposed new buildings in Fleur De Lis road
- Item63556 - Blueprint of plan showing in red the approved alignments, new traffic roundabout and in green lattice the proposed new buildings in Fleur De Lis road
- Item63557 - Blueprint of the palace square in Valletta showing in red the proposed white lines for car parking.
- Item63558 - Blueprint of showing in red the proposed platforms with sheds to be erected in Valletta just outside Porta Reale.
- Item63559 - Blueprint of showing in red the proposed platforms with sheds to be erected in Valletta just outside Porta Reale.
- Item63560 - Plan of the Msida traffic roundabout detailing the proposed lighting system.
- Item63561 - Detail of lamp shades for traffic lights to be used in PDM63560
- 179 more...